SN No. |
Name |
Scope Of Work |
Funded By |
Period |
Cost |
---|---|---|---|---|---|
1 |
Modernization of Telecommunication Network for Digital Connectivity |
Installation of: i) IMS platform at three places ii) AGW & GPON system iii) Transmission system iv) IP system v) BOSS system |
ADP (GoB & Government Concessional Loan of China) |
01 July 2017 to June 2024 |
Total Project Cost: 331494.05, (GOB: 149766.11 (Equity:100082.595 |
2 |
Replacement of old Digital Telephone System of Dhaka city (171 KL) |
1. NGN based Switching & MGW, MGC, Access gateway 2. PSDN, AAA, NMS 3. FTTX 4. XDSL 5. Optical Fiber 450 km. |
BTCL |
01 Sep 2009 to 30 Jun 2013 Extended to 30 June 2014 Extended to 30 Sep 2014 |
24806.00 lac |
3 |
ILDTS Policy-2007 Compliance Project. |
1. Installation of IGW with NGN facility 2. Installation of ICX at Dhaka, Chittagong, Sylhet, Khulna & Bogra 3. Upgrading BTCL’s existing IIG 4. Central Billing System 5. Computerized Accounting System |
BTCL |
01 Apr 2009 to 30 Sep 2013 Extended to 30 Apr 2014 |
10744.00 lac |
4 |
Optical Fiber Cable Network development at Upzilla level (290 Upazilla) |
1. Transmission equipment: STM16 & STM1 Mux 2. a) OFC Network from Upzilla to Union (11060 km) b) OFC Network Accessories 3. Balancing equipment (M/W, SDH Link, Sever ports etc.) |
ADP |
01 Jan 2013 to 31 Dec 2015, Extended to 30 Jun 2016 |
Local: 40470.48 lac, Foreign: 9457.66 lac, Total: 49928.14 lac |
5 |
Optical Fibre Cable Network development in 1000 Union Parishad (1006 Union Parishad) Contact: Project Director, OFCNDP in 1000 UP Phone: 9320258 Project Summary (12Nov2014) |
1. Transmission equipment : STM16 & STM1 Mux 2. a) OFC Network from Upzilla to Union (11060 km) b) OFC Network Accessories 3. Balancing equipment (M/W, SDH Link, Sever ports etc.) |
ADP |
01 (Jan 2012-30 Jun 2014 Extended to 30 Jun 2016) |
Local: 49088.29 lac, Revised: 56824.02 lac, Foreign: 22818.15 lac, Revised: 15073.07 lac, Total: 71906.44 lac, Revised: 71807.09 lac (GoB Fund, Equity) |
6 |
Telecommunication Network Development Project (TNDP) Contact: AGM, TNDP Phone: 9102712 |
1. NGN (IMS) based Telecommunication System with IN & Access Gateway 2. International Gateway Exchange (IGW) 3. National Transmission Backbone OFC Network 1400 km, SDH M/W link 4. Access Facilities-FTTX 5. Wireless Access-WLL 6. ADSL & DSLAM 7. 24/7 National Operation Center (NoC) |
ADP |
01 Jul 2009 - 30 Jun 2013 Extended to: 30 June 2015 |
GOB: 11350.72 lac, P.A: 50935.53 lac, Total: 62286.25 lac |
7 |
Installation of Optical Fiber Cable (OFC) Network at all Govt.College/University and Training Institute Project.Telejogajog Bhaban,37/E, Eskaton Garden, Dhaka-1000.Phone: 02-932-0326 |
1) Cable Purchased from BCS Khulna. 2) OSP Part on Full Turn-key Basis Package-01, Lot-1: Total 178 sites of Dhaka & Mymensingh Division. 3) OSP Part on Full Turn-key Basis Package-01, Lot-2: Total 235 Sites of Barishal, Chittagong, & Khulna Division. 4) OSP Part on Full Turn-key Basis Package-01, Lot-3: Total 174 Sites of Rajshahi, Rangpur & Sylhet Division 5) Equipment Part on full Turn-Key Basis” Package-02, Lot-1, Total 178 Sites of Dhaka & Mymensingh Divisions. 6) Equipment Part on full Turn-Key Basis” Package-02, Lot-2, Total 235 Sites of Barishal, Chittagong & Khulna Divisions.7) Equipment Part on Full Turn-key Basis Package-02, Lot-3: Total 174 Sites of Rajshahi, Rangpur & Sylhet Division. |
Gob(ADP) |
July, 2018 to December, 2019 |
4498.00 lac |
8 |
ILDTS Policy-2007 Compliance Project. |
1. Installation of IGW with NGN facility 2. Installation of ICX at Dhaka, Chittagong, Sylhet, Khulna & Bogura 3. Upgrading BTCL’s existing IIG 4. Central Billing System 5. Computerized Accounting System |
BTCL |
01 Apr 2009 to 30 Sep 2013 Extended to 30 Apr 2014 |
10744.00 lac |